Some of our client list:
State of California- Caltrans
Los Angeles County-5 Freeway Extension Demolition/Abatement of commercial buildings from the 605 Fwy to the Orange County Line
Bakersfield- 55 Freeway Extension demolition/Asbestos Abetment of over 50 residential house and 10 Commercial buildings
Community Development Commission of the County of Los AngelesLos Angeles Department of Water and PowerWest Covina Unified School DistrictAlameda Corridor Transportation AuthorityLos Angeles Unified School DistrictLos Angeles County Metropolitan Transportation AuthorityState of California Department of TransportationLos Angeles County Sanitation DistrictLos Angeles Housing AuthorityLos Angeles World AirportsCity of CoronaCity of Los AngelesLos Angeles CountyCity of OntarioCity of RiversideCity of BurbankCity of InglewoodCity of LancasterOrange County
Demolition of Van Nuys Swap MeetFor The City of Los AngelesScope of Work
The Van Nuys Swap Meet was destroyed by the 1994 Northridge Earthquake. Demolition was done for the County of Los Angeles.
Due to the high volume of landfills being used up, Interior Demolition, Inc. recycled 90% of the lumber. Asbestos abatement was also included in this project.
The Van Nuys Swap Meet was destroyed by the 1994 Northridge Earthquake. Demolition was done for the County of Los Angeles.
Due to the high volume of landfills being used up, Interior Demolition, Inc. recycled 90% of the lumber. Asbestos abatement was also included in this project.
Demolition of Carver GreenfieldFor The Los Angeles County SanitationScope of Work
The Carver Greenfield Fluidized Combustion and Energy Recovery was part of a joint water pollution control plant located in Carson, California.
The work performed included dismantling demolition of designated buildings and foundations, removal and salvage of processing equipment, removal and savage of structural steel, and removal of underground piping and electrical ducts. Also, included in this project was excavation and compaction.
The preparation of a detailed health and safety plan, personnel protective equipment, dust control, stockpile management, equipment, and trucking were just part of the job. All work was successfully performed in a professional, safe, and timely fashion.
The Carver Greenfield Fluidized Combustion and Energy Recovery was part of a joint water pollution control plant located in Carson, California.
The work performed included dismantling demolition of designated buildings and foundations, removal and salvage of processing equipment, removal and savage of structural steel, and removal of underground piping and electrical ducts. Also, included in this project was excavation and compaction.
The preparation of a detailed health and safety plan, personnel protective equipment, dust control, stockpile management, equipment, and trucking were just part of the job. All work was successfully performed in a professional, safe, and timely fashion.